A one-stop source about accessory dwelling units, multigenerational homes, laneway houses, ADUs, granny flats, in-law units…
Skip below to skim through 25 ADU profiles from the spring, 2015 ADU Tour.
We’re getting excited for the ADU Tour on Saturday, November 7th. Registration is now live; early bird sales end on October 24th.
For those seeking design inspiration for small houses, the ADUs on this upcoming tour are exceptionally beautiful. Here’s a sneak preview of a few of them.
None of the ADUs on the fall ADU tour have been featured before–no repeats. They’re all new.
Visit the ADU Tour page for comprehensive information about the tour.
At the risk of confusing people, I also wanted to share ADU profile information from the spring, 2015 city-wide ADU tour.
Information and images like the 25 ADU profiles listed below will be available for all of the ADUs featured on the Fall, 2015 ADU Tour. The profile information from the tour provides TONS of information that can help ADU homeowner/developers learn from others who have gone before them.
Rental
Type of ADU | basement conversion |
Architect/Designer | None |
General Contractor | Self general contracted |
Heating System | Electric cadets |
When did you start the design work? | 6/2014 |
When did you submit the plans to the City? | 7/2014 |
When did you start construction | 6/2014 |
When did you get your certificate of occupancy? | 5/2015 |
Total Square Footage | 750 |
Total Cost (including sweat equity) | $55K |
Cost/Square Foot | $73 |
Sweat Equity estimate (part of the “Total Cost” listed above) | $25K |
Other special project costs |
Re-plumb the entire home, which was not as large of a project as it sounded since the plumbing runs in a straight line across the back side of the house ($2200) Separate electrical meters and service ($2900) Re-wiring to the first and second floors ($5900) |
The research we did on the window well materials – we used sustainable Oregon Juniper that gives the wells a more natural and softer look, we like the stained floor and the special touches we added to the kitchenette to bring in more storage solutions.
The taller ceilings (due to the excavation we did to bring the ceiling height to code), the layout, small space with a lot of amenities.
Would have liked to work in more natural light into the south west side of the apartment, but this is under the porch and next to the chimney fireplace so it would have been really difficult to find a solution.
In an existing, not to code space, we would completely demo including all framing and start from scratch. We would probably use a GC the next time around.
How quickly costs were running up and the decisions, decisions, decisions we had to keep making along the way to keep the project moving forward: trying to nail down subs or contractors for estimates and coordinating them for city inspections – all of which took much more time than we initially anticipated.
Starting from scratch is easier than working around someone’s not to code build out – demo fully before starting the re-building process.
Working around the existing not to code finished basement made it a remodel of sorts. In the end, in order to fulfill our vision of how we wanted the space to flow and feel, we ended up demo-ing, 90% of the existing space and rebuilding.
~Return to Top of page~
We intend to rent it out
Type of ADU | Garage Conversion |
Architect/Designer | Holly Huntley environspdx.com |
General Contractor | Holly Huntley environspdx.com |
Heating System | Electric Cadets |
When did you start the design work? | 01/2014 |
When did you submit the plans to the City? | 02/2014 |
When did you start construction | 07/2014 |
When did you get your certificate of occupancy? | 12/2014 |
Total Square Footage | 624 |
Total Cost (including sweat equity) | $63K |
Cost/Square Foot | $93 |
Sweat Equity estimate (part of the “Total Cost” listed above) | $0K |
Other special project costs | None |
Looks like it’s own little house!
Simple and clean with an open living space. Contractor designed and did well with our requests.
Wish we had the extra money to pay an engineer for a 2nd level. Otherwise nothing least happy about.
I would have submitted the permit request to the city when we initially started the process. Rather than waiting right before we wanted to build. As we were delayed 4 months.
How much extra time it would take to complete the project than originally anticipated.
Really learn as much about the construction process as possible and understand timelines and true costs of unexpected items.
We had to get a variance for a fire wall, the neighbors wrote in b/c they were nervous about increased traffic and our property is an odd shape, so some issues with measuring the property lines.
~Return to Top of page~
We built our ADU to help create a flexible lifestyle. Our basement conversion gives us the opportunity to have out-of-town family stay nearby, and rental income to supplement our mortgage.
Read an extended blog post about this project here.
Type of ADU | Basement Conversion |
Architect/Designer | self |
General Contractor | self |
Heating System | electric cadets |
When did you start the design work? | 7/2014 |
When did you submit the plans to the City? | 7/2014 |
When did you start construction | 7/2014 |
When did you get your certificate of occupancy? | 3/2015 |
Total Square Footage | 625 |
Total Cost (including sweat equity) | $25K |
Cost/Square Foot | $40 |
Sweat Equity estimate (part of the “Total Cost” listed above) | $3K |
Other special project costs | The electric work ended up being more work than we anticipated. We ended up rewiring much of the house and PGE made us move our service from one side of the house to the other. We budgeted $2000 and it ended up being $5000. There was an existing bathroom in the basement that we thought was legal and incorporated in our plans. It turned out not to be, which meant we had to tear out some work and make it legal to today’s code, costing us an extra $2000. |
Our favorite feature is the key card switch that controls the heat in the ADU. Guests must remove a key card when they leave, which turns the heat off. When they return they insert the key card and the heat comes back on.
We added two windows to the basement and love them. In fact, we could have added more and made others bigger.
The entry to our ADU is at the end of our driveway, which means guests have to walk up the narrow driveway, where our cars can be in the way. We’re going to move a fence to make more space but are still working on design ideas to make that entry more inviting.
There were some small issues that we decided to deal with later that I wish we would have taken care of during construction. We were trying to be disciplined, but in hindsight, spending another $1k-2k$ on small items wouldn’t have mattered much in the big scheme of things and definitely worth the price to never think about them again.
We were surprised to learn that the planning office and the inspectors were two separate entities and didn’t always agree with each other. The planning office was very helpful and encouraging of our plan, making us overconfident. The inspectors had a very different approach, questioning much of what we were doing and not offering much helpful advice. Their role is understandable and we’ll know better next time.
We’ve been very happy with the entire process, from designing, to building, to renting. It’s a shift having people living in the same structure after being single-family homeowners for 10 years, but the pros far outweigh the cons in our minds.
We didn’t have issues with planning and zoning. That process was actually much smoother than we had anticipated.
~Return to Top of page~
I am living in it myself and renting out the main house.
Type of ADU | Detached, new construction |
Architect/Designer | environs, environspdx.com |
General Contractor | environs, environsdpx.com |
Heating System | radiant slab – hydronic, gas fired tankless |
When did you start the design work? | 1/2014 |
When did you submit the plans to the City? | 6/2014 |
When did you start construction | 7/2014 |
When did you get your certificate of occupancy? | 1/2015 |
Total Square Footage | 680 |
Total Cost (including sweat equity) | $126K |
Cost/Square Foot | $186 |
Sweat Equity estimate (part of the “Total Cost” listed above) | $0K |
Other special project costs | We had to upgrade the lateral water supply in the street to the house because of the water fixture count exceeding what was allowed for the 5/8″ meter/ 3/4″ city supply – $6000. |
I love how it doesn’t feel as small as everyone thought it would – open, spacious, comfortable.
I love my clean heat (radiant slab).
Nothing!
Nothing!
I forgot to add landscaping into the budget.
Find a contractor that you trust and get them in on the project as early as you can – it will shorten the design/permitting process and ideally keep you on budget from the onset.
Rental
Type of ADU | Detached, new construction |
Architect/Designer | Schuyler Smith polyphon.com |
General Contractor | Greenhammer, Greenhammer.com |
Heating System | Ductless minisplit, electric cadets |
When did you start the design work? | 2012 |
When did you submit the plans to the City? | 1/2013 |
When did you start construction | 2/2013 |
When did you get your certificate of occupancy? | 5/2015 |
Total Square Footage | 800 |
Total Cost (including sweat equity) | $155K |
Cost/Square Foot | $194 |
Sweat Equity estimate (part of the “Total Cost” listed above) | $25K |
Other special project costs | Water upgrades, shared sewer, demolition of garage and foundation. |
How quiet it is and the environmental friendly construction of the building as well as the flow of the space. .
The open feeling of the space and warmth of sunlight from the windows and the porch out of the second floor that give a feeling of a much larger room.
Landscaping, but that is my responsibility.
Not much. I trusted the people I worked with. Tyler Coke from Greenhammer and Schuyler Smith from Polyphon were available when issues arose. Advice, listen to the people you have hired to work on your project. Don’t try to micro-manage the project. You must trust the design and the contractor for the project to succeed.
Like a marathon, it requires physical and emotional energy to complete the project. At the start everyone is excited and it feels good. As you approach the finish and the project is getting to the nagging details, you hit the wall and you don’t feel as good, doubting your decision. Be prepared to be surprised.
Details matter. With each change there is a cost in time and money. More is not always better.
Shared sewer, new water line installation for the ADU.
~Return to Top of page~
We built our ADU for Megan’s mother, Pat. Pat occupied the house in November, 2014 and lives there now with her daughter Cindy.
Type of ADU |
Detached, new construction |
Architect/Designer |
Dustin Johnson, hivearchitecturestudio.com |
General Contractor |
Ryan Duble, rdbuildingdesign.com |
Heating System |
ductless minisplit |
When did you start the design work? |
12/2012 |
When did you submit the plans to the City? |
10/2013 |
When did you start construction |
11/2013 |
When did you get your certificate of occupancy? |
11/2014 |
Total Square Footage |
740 |
Total Cost (including sweat equity) |
$140K |
Cost/Square Foot |
$189 |
Sweat Equity estimate (part of the “Total Cost” listed above) |
$30K |
Other special project costs |
Tearing down old garage and foundation ($2,500) sweat equity ($2,000) Upgrade of electrical service on main house to double meter system and run underground electrical to ADU ($5,000) Run underground gas line to ADU ($2,000) |
We are very proud of the exterior of the house. One of our concerns was how it would fit in with our yard and the neighborhood. Dustin did such an incredible job designing a home that has detail and charm. He met our dream of a little cottage while also complementing the main house. We love how it looks and our neighbors have given us nothing but positive feedback.
What we love most about the house is the kitchen. Pat is a huge cook and loves to feed people (not to mention all her kitchen gadgets that need storage). We chose an open design that centers around the stove and island. It’s really true that people always seem to gather in the kitchen and our design makes that easy.
The high ceilings and open floor plan have proven to be a challenge to heat effectively. A ceiling fan will help, but sometimes we wish we had chosen radiant heating.
A point that we come back to a lot would be ensuring better communication throughout our team. Most critically, good communication between our architect and our contractor. This would have helped us to make wiser and more educated financial decisions. The architect was our dreamer and the contractor was our realist. Even though these are their appropriate roles, it was sometimes hard for us to recognize the balance we were looking for. More communication between everyone would have helped iron out some financial/design challenges.
I learned it is best to ask questions and make sure your sub-contractors fully understand the job in order to be sure everyone is on the same page.
The advice I wish I had gotten before starting my detached ADU would be to have a better understanding of the methods and requirements for connecting the utilities to the new building.
There were a few small design issues the city asked us to change but no major changes to the design were required. For example, we had hoped to add some small, aesthetic details in the siding that differed from our existing home. In the end, none of our variations were approved.
~Return to Top of page~
Rental property
Type of ADU | Detached, new construction, above a garage |
Architect/Designer | Stephan Williams, rainbowvalleyinc.com |
General Contractor | Rainbow Vally Design and Construction, rainbowvalleyinc.com |
Heating System | Gas fireplace |
When did you start the design work? | 3/2014 |
When did you submit the plans to the City? | 5/2014 |
When did you start construction | 8/2014 |
When did you get your certificate of occupancy? | 2/2015 |
Total Square Footage | 504 (ADU) + 900 (garage) |
Total Cost (including sweat equity) | $190K |
Cost/Square Foot | $135 |
Sweat Equity estimate (part of the “Total Cost” listed above) | $5K |
Other special project costs | The city required engineered supports for the vaulted ceilings. The additional cost for manufacturing metal brackets and installing them ($3,000) |
I am most proud that my ADU fits into the neighborhood. On a street of 100 year old homes, it doesn’t look like a modern afterthought.
I love the high ceilings. The space feels much larger than it is. I am also very happy with the finishes, given a limited budget.
I wish we would have planned plumbing into the garage so that space could be converted more easily in the future.
I would wait on the construction phase until I late spring or early summer when I had more time to be involved.
I had no idea the project would take so long. It was a stressful year.
Make sure you plan for added expense and more time. If you think you will have the project ready to rent in three or four months and it takes a year, it can be a challenge to the monthly budget.
There were no significant issues with permitting but the city was very slow to process the plans.
~Return to Top of page~
We are using the ADU as a guest space for family and friends and as a short term rental through Airbnb.
Type of ADU |
Detached, new construction |
Architect/Designer |
Carly Boynton, Grain Design Build |
General Contractor |
Stephen Smith, Design Build Portland, designbuildportland.com |
Heating System |
Electric radiant – Comfort Cove. WarmWire electric coils beneath the bathroom tiles. |
When did you start the design work? |
8/2013 |
When did you submit the plans to the City? |
9/2013 |
When did you start construction |
10/2013 |
When did you get your certificate of occupancy? |
11/2014 |
Total Square Footage |
300 (ADU) + 170 (workshop) |
Total Cost (including sweat equity) |
$119K (including the attached 170 ft workshop) |
Cost/Square Foot |
$253 |
Sweat Equity estimate (part of the “Total Cost” listed above) |
$23K |
Other special project costs |
Additional project costs included: new driveway ($1600) new fence ($1k) landscaping / patio + paths ($7k) bike shed ($2k) |
All of the parts we were able to create ourselves from salvaged materials saved from deconstruction of the prior garage (including the kitchen ceiling, loft floor, bathroom door, main door of the workshop, indoor trim, outdoor light boxes, shingles and kitchen bar) along with the reclaimed materials we found in town (the pre-ball bearing hardware for the bathroom door from 1891, the beam light, the ten dollar kitchen cabinets, the tiny stove).
The loft, vaulted ceilings and skylights; the extra 1.5 inches of wall thickness for insulation with thermal breaks; the heated floor in the bathroom; the loft of the workshop that allows extra storage for our own stuff; the door between the two spaces (workshop and ADU) and the huge shop door.
Keeping our birch tree in the backyard was worth it for the shade and its loveliness, but cleaning the ADU gutters is difficult.
We might not choose to begin the project when we had a six-month-old baby at home. (We envisioned time to work since one of us would be home with the kid anyway, but – as any seasoned parent would tell you and some tried to warn us – this proved rare to impossible.)
We would also do more of our own research on drywall options and pay the additional cost for thicker, sturdier drywall as well as more careful drywall installers (ours covered up several electrical outlets and the fire alarm box during installation).
We were surprised, for months on end, at how all-consuming this process was, and how many decisions needed to be made – some large, some tiny, but often quickly and without what felt like adequate time to research the options as well as we would have liked.
Julie: Do it! Despite the stress, it is so very lovely to have extra work and storage space for ourselves, and our family, friends, and renters have loved the private, cozy space we created. It’s nice to have the Airbnb income after so many months of hemorrhaging money, and wonderful to have a space for our parents to stay for days or even weeks at a time without feeling like we are stepping on each others’ toes.
Oren: This is a big project, especially if you are trying to save money by doing some things yourself and you also make an effort to make use of salvaged materials. The things we did ourselves feel more special, but the project has been all consuming over the whole year that it has been going on. Other than becoming parents, this is the biggest project Julie and I have taken on together. I’m pretty sure I would do it again if I had to make the choice a second time, but not 100%. Don’t jump in lightly.
We initially were hoping to raise or add on to an existing small, detached garage, but the city has stringent rules about not changing the footprint or height of existing structures if they are within the setback (as ours was). Instead, we opted for deconstruction of the garage and construction of a new detached space 5 feet from the side and rear property lines.
We also had an initial design rejected by the city because it called for a sloped shed roof instead of a gable roof, and the city requires roof pitch and type (as well as siding type) to match the main house for detached ADUs.
~Return to Top of page~
Katie’s mother, Judy, lives in the ADU year round.
Type of ADU |
Garage Conversion |
Architect/Designer |
Design Build Portland, LLC, designbuildportland.com |
General Contractor |
Design Build Portland, LLC, designbuildportland.com |
Heating System |
Radiant hydronic |
When did you start the design work? |
8/2013 |
When did you submit the plans to the City? |
10/2013 |
When did you start construction |
12/2013 |
When did you get your certificate of occupancy? |
7/2014 |
Total Square Footage |
540 |
Total Cost (including sweat equity) |
$125K |
Cost/Square Foot |
$231 |
Sweat Equity estimate (part of the “Total Cost” listed above) |
$0 |
Other special project costs |
Upgrade our water service ($5k) land use review ($2k) installed tankless hot water heater in main house to share with ADU for hot water/heating ($5k) buried our electrical connection because my mom hates to see wires ($2k). |
I love the heated floors, kitchen counters, and the bathroom.
Open, bright floor plan. We also decided to keep a large kitchen and have a smaller living room area because my mom likes to cook. It has turned out to be a great addition to our main house to have a full-sized second kitchen out back. When we have parties or large groups for holidays, we can use the ADU kitchen for all of the last-minute messy stuff and the main house still looks great when guests arrive.
I would have spent more time researching window options to get them entirely pre-finished before installation. We ended up having the interiors painted after installation, which was a little bit messy.
Nothing, we are thrilled with how it turned out and the process was pretty painless (for major construction!).
There are so many choices in custom construction. It can be really overwhelming. Keeping your focus on the end product and the big picture is hard, but worth it to keep things moving along. We feel it was really worth the trouble for the added space and flexibility our ADU gives us.
Find professionals you feel really good about. If you aren’t communicating well at the beginning, it is probably going to get worse before the project is done. We had to fire our first architect due to challenges communicating. It was a tough decision, but things were much smoother once we did it. Also, educate yourself about the process, even if you can’t be involved in the construction in a major way. It will help you and your builder to speak the same language a little.
We had to have a land use review (LUR) because our garage was in the rear and side setback and had non-conforming eaves.
~Return to Top of page~
Primary residence
Type of ADU |
Detached, garage conversion |
Architect/Designer |
N/A |
General Contractor |
Don Kern |
Heating System |
Electric cadets |
When did you start the design work? |
5/2014 |
When did you submit the plans to the City? |
6/2014 |
When did you start construction |
6/2014 |
When did you get your certificate of occupancy? |
8/2014 |
Total Square Footage |
400 |
Total Cost (including sweat equity) |
$46K |
Cost/Square Foot |
$115 |
Sweat Equity estimate (part of the “Total Cost” listed above) |
$3K |
Other special project costs |
N/A |
Ease of use
It’s cabin-like feel
None
Design in more lighting, and a heat exchanger
Block wall fire codes
Get to know the design sense of your builder
(editors note: the address is incorrectly printed as 1135 NE Skidmore St in the booklet).
Primary residence. Read an extended blog post about this project here.
Type of ADU |
Detached, new construction |
Architect/Designer | |
General Contractor |
Dan Maust Construction |
Heating System |
Ductless minisplit, electric cadets |
When did you start the design work? |
12/2012 |
When did you submit the plans to the City? |
1/2013 |
When did you start construction |
3/2013 |
When did you get your certificate of occupancy? |
4/2015 |
Total Square Footage |
528 |
Total Cost (including sweat equity) |
$98K |
Cost/Square Foot |
$186 |
Sweat Equity estimate (part of the “Total Cost” listed above) |
$15K |
Other special project costs |
Many of the costs seemed high but it was hard to put things in perspective as this is the only house I have built. I feel like you can’t really shop the construction costs around too much. All the good builders in Portland are busy so you really have to just accept that they are giving you somewhat of a fair price. When you don’t know the difference between expensive and fair it’s hard to swallow. I feel the costs are a little higher then they should be… just because ADUs aren’t normal and contractors are used to bidding larger houses. |
I think the exterior details really match the NE Irvington neighborhood style
The location. Its nice to build something in such a nice walkable and livable location.
It’s nice to make an investment in your community rather than investing in overseas mining operations or multinational corporations employing in countries with little or now workers rights.
Really not sure yet as I’m still knocking away at the interior finishes.
I would probably put two bathrooms in the ADU. There is a stairway between the downstairs living space and upstairs loft…. it seems like it would be nice to have a bathroom in each space.
I enjoy working with the trades people who do this for their living; such as, carpenters, plumbers, roofers and such
Just do it! Talk to your neighbors so they feel comfortable and interested in your project. Find an architect who you like to work with and has a lot of good ideas.
Primary residence
Type of ADU |
Detached, new construction with garage |
Architect/Designer |
Randal Groves |
General Contractor |
Jacob Flory |
Heating System |
ductless minisplit |
When did you start the design work? |
3/2013 |
When did you submit the plans to the City? |
6/2013 |
When did you start construction |
8/2013 |
When did you get your certificate of occupancy? |
1/2015 |
Total Square Footage |
792 |
Total Cost (including sweat equity) |
$135K |
Cost/Square Foot |
$170 |
Sweat Equity estimate (part of the “Total Cost” listed above) |
$30K |
Other special project costs |
Oil tank removal, new sewer line, new electrical service, new sidewalks, new retaining wall, new driveway.- $50K (not included in ADU cost above) |
Steel Bridge Mural and the handrail system that emulates the pedestrian level of the Steel Bridge.
The feeling of a larger than 800 square foot living space.
Living Room is a little tight.
I would have done my due diligence in the sourcing of sub contractors and I would have instituted a financial incentive for meeting deadlines.
The City of Portland Bureau of Development Services was easy to navigate and people were helpful at every turn.
The bitterness of poor quality remains long after the sweetness of low price is forgotten.
-Benjamin Franklin
This ADU will primarily be used as a short term rental. Having a space like this that we can use for family and friends when they come to Portland is great. AirBnB allows us to ‘block off time’ when we would like the space for family and friends. It makes a great birthday kids party venue too!
Type of ADU | Detached new construction, garage below. |
Architect/Designer | Dave Spitzer, DMS Architects, adupdx.com |
General Contractor | Jim Forristal |
Heating System | Rinnai gas wall furnace |
When did you start the design work? | 2/2014 |
When did you submit the plans to the City? | 4/2014 |
When did you start construction | 7/2014 |
When did you get your certificate of occupancy? | 1/2015 |
Total Square Footage | 374 (ADU) and 374 (garage) |
Total Cost (including sweat equity) | $130K (including the attached 374 ft workshop) |
Cost/Square Foot | $174 (including the garage) |
Sweat Equity estimate (part of the “Total Cost” listed above) | $40k |
Other special project costs | Demolition of old garage and foundation (3k)Land use adjustment (2k)Additional retaining wall, stairs and grading (5k) |
The finished floor was done by an artist and is a unique and interesting piece of art.
Cathedral ceiling, skylights and bay window all make the small space seem bigger.
Everything seems to work in this space.
Complete exterior work during the dry season.
I was surprised at the difficulty getting a project through the permitting process with a land use adjustment. It will take more time than you think.
Think about the height of the finished structure, it’s orientation to the sun’s path, and the effect of having a large massing in that location. This is a two story structure – ours is 18′ to the mid-line on the roof with a 10:12 pitch making the overall height about 26′.
We had one adjustment for a setback. The standard 15′ setback for garages would have put the structure in an awkward place so Dave Spitzer made a great case with the city for allowing a 5′ setback.
~Return to Top of page~
Studio. Addition to ADU conversion. Converted to ADU in 3/2015
Type of ADU | Addition to ADU conversion |
Architect/Designer | Constructive Form Architecture and Design LLC, constructiveform.com |
General Contractor | Citilites Builders, Inc |
Heating System | hydronic heating |
When did you start the design work? | 8/2010 |
When did you submit the plans to the City? | 11/2010 |
When did you start construction | 7/2012 |
When did you get your certificate of occupancy? | 1/2013 |
Total Square Footage | 500 |
Total Cost (including sweat equity) | $130K |
Cost/Square Foot | $260 |
Sweat Equity estimate (part of the “Total Cost” listed above) | $20K |
Other special project costs | Tearing down old garage and foundation. Separating shared party sewer. |
Need to phase project due to costs – later phases to include completing exterior landscaping and patios and covered entry.
Would have the connection between the existing house and new addition more detailed (was a cost issue, more insulation and resilient channels) to minimize sound transfer between the main house and the ADU.
City process was more efficient and easier than initially thought – was able to get an over the counter permit for the project.
Small houses, compact designs will likely be more cost per square feet than larger houses.
Shared sewer separation.
*Organizer note: This project was formally converted from an ‘addition’ to an ‘ADU’ in 2015.*
~Return to Top of page~
Rental and we have two wonderful tenants.
Read an extended blog post about this project here.
Type of ADU | basement conversion |
Architect/Designer | Das Chapin |
General Contractor | Das Chapin |
Heating System | electric cadets |
When did you start the design work? | 1/2013 |
When did you submit the plans to the City? | 2/2013 |
When did you start construction | 2/2013 |
When did you get your certificate of occupancy? | 4/2013 |
Total Square Footage | 780 |
Total Cost (including sweat equity) | $50K |
Cost/Square Foot | $64 |
Sweat Equity estimate (part of the “Total Cost” listed above) | $25K |
Other special project costs | Separated electrical service (not mandatory) ($4K) |
How the rooms relate to each other. It is really cozy and still feels spacious.
Creating livable space out of what would normally be storage, laundry, and a little used guest room.
More natural daylight in the kitchen and living room.
Be better informed with the city requirements before beginning.
Though we had a lot to learn in terms of meeting the ADU requirements, the city was very helpful in showing us what we needed to do and how to do it.
Consult with a knowledgeable person about your overall concept before you make any large decisions.
Not any difficult issues to overcome, but we did have a learning curve on some of the details of separating the ADU from our part of the house, including plumbing, sound-proofing, blocking off the existing hot air ductwork and installing electric heat.
~Return to Top of page~
This project was built with a few goals in mind:
Read an extended blog post about this project here.
Type of ADU | Detached, above a workshop |
Architect/Designer | Self designed |
General Contractor | Self general contracted with help from jragbc.com |
Heating System | ductless mini-split |
When did you start the design work? | 2007 |
When did you submit the plans to the City? | 12/2009 |
When did you start construction | 3/2010 |
When did you get your certificate of occupancy? | 10/2010 |
Total Square Footage | 546 (ADU) + 665 (workshop) |
Total Cost (including sweat equity) | $160K (including the attached 665 ft workshop) |
Cost/Square Foot | $132 |
Sweat Equity estimate (part of the “Total Cost” listed above) | design, sourcing materials, construction, finding subcontractors, and swinging a hammer ($50K) |
Other special project costs | SDCs- they did this ADU just before the waiver. 😦 ($10K)upgraded water and sewer line, metal roof |
Most of the internal trim work is reclaimed wood from the previous structure. An ADU is small enough that trim and detail work doesn’t get overwhelming like it might doing a full size house.
The comments we’ve had from neighbors and passers-by have been 99% positive, and the 1% of other made us laugh, so aesthetically I feel we did well. This is a building we knew we’d be passing by every day and we wanted to be happy with the look and feel of what we put in our front yard. Working around the existing bushes and trees was tricky, but having mature vegetation helps make it look like it’s always been in our yard.
The thin shell concrete porches were somewhat experimental and the one most exposed to the weather is not holding up as well as I’d like.
Our framing subcontractors were decent at doing basic framing, but afterwards I did a walkthrough with James Ray Arnold of JRA Greenbuilding and he pointed out numerous ways that high- efficiency framing would have saved material costs and made the building far more energy efficient. We tried going green to a limited extent and I wish we would have gone further.
A telephone was the best cost saving device for our project. The first bid for a sewer line replacement and tie in was about $10,000. We ended up finding a good company that did that work plus gas, electric and water line boring for about $4000.
Think about the whole picture, not just the ADU. Can you work in shop/ storage space, solar access, rainwater collection, better landscaping/ gardening, and ideally some sense of community space with future residents?
We had to go through the land use review process and get variances for some design details as well as setback requirements. Code requirements are limited and narrowly tailored to common site layouts, and since our house is at the back of the lot we had to get a variance to put the ADU within 60′ of the front property line.
~Return to Top of page~
This is the second rental house on the property. Someday we may move into one of the two. We are currently renting the ADU long term and are recouping its cost.
Type of ADU | Detached, new construction |
Architect/Designer | R & B Design Studio LLC, RnBdesign.org |
General Contractor | EcoPowerNW, LLC. Norm Yonemura ecopowernw.com |
Heating System | Ductless minisplit |
When did you start the design work? | 4/2013 |
When did you submit the plans to the City? | 3/2014 |
When did you start construction | 4/2014 |
When did you get your certificate of occupancy? | 12/2014 |
Total Square Footage | 728 |
Total Cost (including sweat equity) | $187K |
Cost/Square Foot | $256 |
Sweat Equity estimate (part of the “Total Cost” listed above) | $30K |
Other special project costs | Tearing down old garage. $3KNew dual meter base on front house. $5KRemove 4 good sized trees $4K |
The 5.2 KW solar pv system which essentially will (if occupants are paying attention) result in a net zero energy home.
1)Tall ceilings, 2) passive solar heating, 3) very rugged polyaspartic concrete slab floor finish, 4) very air tight construction, 5) mini split heat pump, 6) roof/ceiling structure with: a. raised heel energy trusses, b. Spray in closed cell foam and blown in fiberglass insulation under pressure completely sealing and filling (no vented attic space) roof/ceiling structure, 7) Earth Advantage Path 4 certification, 8) high efficient Milgard windows rated U-2.5 with dual (not triple) pane glass, 9) fully ducted heat recovery ventilation system, 10) 2×6 studs 24″ on center & 5 ply plywood wall structure with roof/ceiling trusses pointed loaded directly on wall studs eliminating need for dual top and sill plates and all fenestration headers resulting a much more energy efficient walls, and 11) room for off street parking and a good sized raised bed vegetable garden.
I have no problems with the design, it’s the cost that will kill you!
I would rob a bank first (like the banks robbed the taxpayers for their bailouts in 2008) to get the money to build. Then I would not need to worry about where the money was to come from.
I was surprised with the complete attention to details on the part of Portland building inspectors (which really protects the owner’s investment in the project).
If you want a super energy efficient house without spending an arm and a leg I would recommend this builder; Norm Yonemura of EcoPowerNW.
Primary residence but also rent it short term for income while we travel/explore.
Read an extended blog post about this project here.
Type of ADU | Garage conversion |
Architect/Designer | Zenbox Design, zenboxdesign.com |
General Contractor | Zenbox Design, zenboxdesign.com |
Heating System | Natural gas fireplace |
When did you start the design work? | 7/2013 |
When did you submit the plans to the City? | 11/2013 |
When did you start construction | 11/2013 |
When did you get your certificate of occupancy? | 2/2014 |
Total Square Footage | 480 |
Total Cost (including sweat equity) | $85K |
Cost/Square Foot | $177 |
Sweat Equity estimate (part of the “Total Cost” listed above) | all design, management and much of the labor- $20K |
Other special project costs |
land use adjustment ($2k) accordion door/wall ($11K) high end chef quality stainless appliances ($6K) spa-like wetroom bathroom ($7K) |
We designed and built almost every surface and detail by hand, much of it from reclaimed and locally sourced materials. From custom cabinetry to a rolling island that transforms into a dining table to custom barstools.
That’s something we’ve always dreamt of… but simply wasn’t possible until the scope of our small home allowed it.
Our goal was a zen living space. A minimalist lifestyle with the ability to entertain…and the design fits those goals perfectly.
Someday we want a rooftop garden and solar panels to supply our electrical needs. Neither was in the initial budget, but we’re still looking forward to finding a way to make it happen in the future.
The only change we would make is having done it a decade earlier.
Because we were very thorough and mindful in the design phase the result was exactly what we visualized, and we’ve created our perfect living space.
How much it would change our lives and lifestyle completely. Our ADU home has become the roof over our heads, our livelihood and our retirement plan.”
It’s always a good idea to spend some time in a space roughly the size of What you plan to build before breaking ground. We usually recommend renting at least a few nights at a comparably sized small home or ADU to make sure you will be comfortable before making the leap.
Worst case scenario, you decide its better to live in the main house and rent the ADU or share it with family. Best case scenario, you love the space, know you can downsize and have a few great takeaway ideas for your own project!
We had to file an adjustment with the City to allow our driveway to be shorter than code typically allows. The driveway already existed, but converting the garage to an ADU meant the current driveway no longer met code.
~Return to Top of page~
Just moved into it and it will be my primary residence
Type of ADU | Detached, new construction |
Architect/Designer | Ben Waechter benwaechter.com |
General Contractor | Ann Wilson/Ben Shook |
Heating System | radiant hydronic |
When did you start the design work? | 5/2012 |
When did you submit the plans to the City? | 1/2013 |
When did you start construction | 3/2014 |
When did you get your certificate of occupancy? | 4/2015 |
Total Square Footage | 800 |
Total Cost (including sweat equity) | $175K |
Cost/Square Foot | $218 |
Sweat Equity estimate (part of the “Total Cost” listed above) | $40K |
Other special project costs | I had custom cabinets made and wood wall panels. I also chose hardward floors that were significantly more than carpet. Tile work was also a great cost. |
I love the floor to ceiling doors and windows and the entire wall of cabinets and workspace
Same as above
I do not have enough storage and I’m still working on that
I would do more research and learn more about the process so I could have been a better general contractor.
I learned how important things being level, plumb, and square are, and how to make sure they stay that way during the entire process.
I thought some things would be much easier than they were. I would say that every little thing is important and you have to be the one who takes responsibility and keeps a watchful eye.
Not really, lots of issues came up but usually by the time we called for the inspection all of the issues were resolved and planning and zoning was pretty smooth sailing
~Return to Top of page~
Work was permitted as an addition, not as an ADU. First floor is a pottery studio; second floor is a large bedroom and bath. City code prohibits an ADU and a “type 1” home occupation on the same single-dwelling site; we plan to convert it to a 2-story ADU if or when Adrienne retires from pottery teaching and production.
Read an extended blog post about this project here.
Organizer’s note: This is not actually an ADU, but it is an ‘ADU-ready’ structure, much like site #2 (Constructive Form Architecture and Design LLC) had been before converting to an ADU from an addition.
Type of ADU | Detached, new construction |
Architect/Designer | Ken Klos, kenklosarchitect.com |
General Contractor | Nicholas MacDonald |
Heating System | one wall mounted cadet forced-air heater and three wall-mounted radiant gas heaters (no fan or blower, to avoid stirring up clay dust in studio) |
When did you start the design work? | 7/2000 |
When did you submit the plans to the City? | 5/2001 |
When did you start construction | 9/2001 |
When did you get your certificate of occupancy? | 1/2003 |
Total Square Footage | 800 |
Total Cost (including sweat equity) | $185K |
Cost/Square Foot | $232 |
Sweat Equity estimate (part of the “Total Cost” listed above) | 0 |
Other special project costs | Demolish existing concrete garage and retaining wall; major excavation for new larger garage and +/- 70’ long retaining wall along E property line; construct new retaining wall and storm drainage system; remove/decommission old underground oil tank; new electric service; expand gas service; exterior concrete slab and pavers for pottery kiln area; construct 10’x20’ rear deck on ground floor and approx. 100’ of perimeter good neighbor fence. |
The upstairs is light and bright in just about any weather. It’s a great space.
High peaked ceiling in bedroom; large sliding glass doors (with “Juliet” balconies) on both floors, producing great natural light; provision for future addition of a lift from garage to first floor; creatively designed (and attractive) connection between existing house and addition; clever “pocket” half-bath under stairs on first floor; custom steel railings on stairs and balconies; great relight and skylight touches; bamboo flooring
Floor tracks of sliding doors are difficult to keep clean
Adrienne would have preferred to have a second-floor balcony on the west side, which we voluntarily deleted from the design to address a neighbor’s privacy concerns
In a project this big and complex, there are bound to be surprises—such as what a huge job it was to replace the old failing retaining wall north of the new addition—and how the project couldn’t be built without doing that really big piece.
Advice? Get an architect as thoughtful and creative as Ken
We needed an adjustment to the garage street setback (code required 18 feet) to move the two-story addition away from the neighboring property owner (who nonetheless objected to the adjustment) and retain a portion of our rear yard. We needed a revocable permit from Transportation to rebuild our side-yard retaining wall one foot from the sidewalk rather than two.
~Return to Top of page~
We just completed the ADU this spring. Near term, it will be a short-term rental. Ultimately, we plan to rent it long-term to friends or family members.
Read an extended blog post about this project here.
Type of ADU | Attached- conversion of existing main floor footprint- “carve-out ADU” |
Architect/Designer | Owner-designed |
General Contractor | RS Wallace Construction, rswallace.com |
Heating System | ductless mini-split heat pump |
When did you start the design work? | 4/2014 |
When did you submit the plans to the City? | 8/2014 |
When did you start construction | 9/2014 |
When did you get your certificate of occupancy? | 4/2015 |
Total Square Footage | 220 |
Total Cost (including sweat equity) | $55K |
Cost/Square Foot | $250 |
Sweat Equity estimate (part of the “Total Cost” listed above) | $25K |
Other special project costs | The ADU’s new entry and covered porch required a setback variance application fee ($2K).The primary residence full bathroom became part of the ADU, so we built a new one to replace it. Also staying with the footprint of the original house, we converted the back, covered porch (4’ x 5’) into a full, wet bath. Compact fixtures to fit well within the space and water-proofing and drainage details all added complexity and cost. |
The ADU’s new covered porch, built primarily of durable, Oregon-sourced Restoration Juniper, is welcoming, functional and aligns architecturally with the original house.
Creatively carving-out 220 square feet from the main floor of our house saved design and construction costs (vs. detached ADU) with no significant compromise to the livability of our home. A full kitchen – stove, oven, frig, freezer, dishwasher, counter space and storage space – all within an 8-foot-long wall works well.
We don’t know yet, but we are concerned about the sound transmission. We implemented some reasonable acoustic control measures to the ADU-primary house shared walls and ceiling (resilient sound isolation clips (RSIC), second layers of gypsum board, insulation, putty packs around electrical boxes), but its effectiveness is to be determined.
Nothing really. We went into it with a well thought out design and relatively detailed drawings and an excellent general contractor, Richard Wallace, who navigated the process and any unforeseen issues.
We have a lot of experience renovating old houses (including this one), so there were no big surprises. We, however, remain astounded by the number of and the level of details related to good design and construction—and the smaller the space, the more the details matter.
Due to the vicinity of the new entry porch to the property line, Planning/Zoning required approval of a setback variance, and fire-life safety required over-engineering of the porch timber framing
Long-term rental with the intention of housing an aging family member in the future.
Type of ADU | Detached new construction |
Architect/Designer | Design by Eamon Brennankos, plan drawings by Design Build Portland |
General Contractor | AK Bulders Inc. akbuildersnw.com |
Heating System | Electric cadet heaters |
When did you start the design work? | 8/2014 |
When did you submit the plans to the City? | 10/2014 |
When did you start construction | 11/2014 |
When did you get your certificate of occupancy? | 3/2015 |
Total Square Footage | 675 |
Total Cost (including sweat equity) | $100K |
Cost/Square Foot | $148 |
Sweat Equity estimate (part of the “Total Cost” listed above) | $15K |
Other special project costs | None |
The flow of the main space and staircase.
Vaulted ceilings, large exposed beams, custom art piece from my contractor.
The second floor is a bit crowded by the size of the bathroom.
I would more closely vet the services associated with plan set preparation and negotiation with the City of Portland and work more closely with the person completing those plans to ensure all details were finalized prior to submission.
The most surprising thing I learned is that I really enjoy construction.
Educate yourself; talk with other people who have built ADUs, take the ADU class, plan-plan-plan and pay attention to all the little details but mostly, select a quality contractor who you like and can work with!
The ADUs will be sold as separate dwelling units; they are part of a six-unit shared space community. Read an extended blog post about this project here.
Type of ADU | Detached, new construction |
Architect/Designer | Jill Cropp, Studio Cropp, studiocropp.com |
General Contractor | Ethan Beck, Ethan Beck Homes, ethanbeckhomes.com |
Heating System | Ductless minisplit |
When did you start the design work? | 1/2014 |
When did you submit the plans to the City? | 7/2014 |
When did you start construction | 11/2014 |
When did you get your certificate of occupancy? | 6/2015 |
Total Square Footage | 610 |
Total Cost (including sweat equity) | $175K |
Cost/Square Foot | $287 |
Sweat Equity estimate (part of the “Total Cost” listed above) | $0. Professional designer/developer full time. |
Other special project costs | Due to the fact that the ADUs are part of a larger development project, it is hard to parse out the exact costs. Construction alone (sans lot costs, planning costs, design costs,etc.) is probably around $100K per unit. I had land division/planning costs.And I was required to install fire sprinklers in the ADUs given their distance from the street (over 150′) which was a substantial cost. |
My goal, which I think I met, was to provide a high quality, well designed and affordable housing option.
For small spaces, they feel open and bright due to open floor plans, abundant windows and vaulted ceilings.
I genuinely like everything about them.
Most of my “if only I had…” thoughts are related to the overall project’s design and development process. I’m quite pleased with how the ADUs themselves turned out.
Being a bit claustrophobic myself, I was surprised at how livable and spacious 650 sq. ft. can feel.
Focus on quality design and layout. Open floor plans, abundant natural light, tall ceilings, light colored finished, etc. can all help a small space feel large.
There were neighborhood association issues during the land division process. There were also issues with the Fire Department requiring sprinklers in the ADUs which significantly raised costs.
~Return to Top of page~
Total Square Footage | 735 |
Total Cost (including sweat equity) | $175K |
Cost/Square Foot | $238 |
Otherwise, same responses as project #11.
~Return to Top of page~
I live in the red cottage in front of the ADU, it is used for short term rental and my college bound son uses it in between the academic calendar. In the future it will be my retirement home and I will rent out the red cottage.
Type of ADU | Detached, new construction |
Architect/Designer | Emily ReFi Waterleaf Architects & Candace Kramer |
General Contractor | self general contracted |
Heating System | ductless minisplit |
When did you start the design work? | 10/2012 |
When did you submit the plans to the City? | 1/2013 |
When did you start construction | 2/2013 |
When did you get your certificate of occupancy? | 8/2013 |
Total Square Footage | 400 |
Total Cost (including sweat equity) | $85K |
Cost/Square Foot | $212 |
Sweat Equity estimate (part of the “Total Cost” listed above) | $15K |
Other special project costs | Putting a french drain along the side of the red cottage at the same time to waterproof the basement. This was the same trench used for plumbing/water lines to the ADU ($8k)New driveway to replace the driveway that was destroyed by the heavy equipment ($6k) |
The scale of the Studio to the the red cottage and garden, it does not overpower the lot or overshadow my neighbors yard. I also like large shower with the rock floor that has no curb.
I like the pine ceiling, it could’ve been just sheetrocked, it adds texture and warmth with the vaulted ceiling. I also like the privacy of the space from the other home and the back patio that looks on to the garden.
I would of liked to put in heated floors on the concrete- but it came off the list because of expense. The concrete is very easy maintenance- you just need to wear slippers.
I would of done it two years earlier!
Since my background is design/build, I understand the process and now help many of my clients with their homes or find them a home with ADU potential. I started a blog – downsize my space during the recession since many of my clients were looking for a simpler lifestyle.
The driveway and landscaping needs to be part of the BIG picture, think big scale of how the ADU sites on the site and will impact your neighbors. Be sure to figure architects costs after when they hand you the plans, there are site visits and changes that will occur.
Working out shared sewer separation, be sure to have survey and engineer and architect all communicating to each other.
~Return to Top of page~
I am coming up to Portland for the “Event,” but only ablee to stay for Saturday Nov. 7th. Can I sign up just for the tour of homes on Saturday, but not the rest of the conference? How, and How much?
Thanks.
Yes. You must register for each event separately from https://accessorydwellings.org/adu_tour/
Pingback: Portland ADU Tour – Part 3 | year of months
Pingback: Portland ADU Tour: Lessons Learned | year of months
Pingback: Accessory Dwellings
Pingback: Susan Eliot’s ADU: Two Stories & A Mezzanine Office | Accessory Dwellings